Structured cabling handover checklist

The records, labels and tests a cabling handover should contain.

Editorial type
Checklist
Related system
Structured Cabling

A clean rack helps, but the handover must also show how every outlet, backbone and patching location was tested and recorded.

Checklist

Physical record

Collect approved layouts, rack elevations and labelling conventions.

  • Outlet and patch-panel schedules
  • Backbone and riser routes
  • Rack power and equipment clearances
  • Spare capacity
Checklist

Test record

Define the test standard and ensure failures, repairs and final results are traceable.

Checklist

Operating record

Keep MAC procedures, administrator contacts and warranty documentation together.